Zhanggang Daxin Thermal Power Co., Ltd. Environmental Impact Assessment Report Publicity 2
Zhangjiagang Daxin Thermal Power Co., Ltd.Entrustment Anhui Huizetong Environmental Technology Co., Ltd.The prepared environmental impact assessment report has been completed, and it is planned to apply for environmental impact assessment registration to Suzhou Ecological Environment Bureau. According to the relevant requirements of information disclosure, it is now publicized to the public.
Project Name |
Construction site |
Construction unit environmental protection measures commitment |
Sludge reduction treatment project |
Top Coast Village, Daxing Town, Zhangjiagang City, Suzhou |
Exhaust gas:Organized waste gas mainly negative pressure waste gas and drying waste gas (NH3,H2S, dust), equipped with cyclone dust removal+Condensation+Acid-alkali washing+Wet electrostatic, dust treatment efficiency98%,NH3,H2STreatment efficiency90%. Negative pressure waste gas collection efficiency90%Drying waste gas collection efficiency95%. Unorganized waste gas is mainly dust (3.96 t/a)、NH3(1.8058t/a)、H2S(0.0012t/a). Exhaust emissions can meet the "Comprehensive Emission Standard for Air Pollutants" (GB16297-1996) Table2Standard.Less impact on ambient air.
Wastewater: No domestic sewage is generated in this project, which is mainly production wastewater.28583t/aAfter pretreatment by wastewater equipment, it can be taken over to Zhangjiagang Daxin Sewage Treatment Co., Ltd. for centralized treatment and discharge up to standard.
Solid waste: The solid waste generated in this project will be collected and transported by the export and sanitation departments.
Noise: in terms of noise prevention, high-efficiency and low-noise equipment shall be selected. High-noise equipment shall be arranged indoors or used at different time as far as possible. The plane layout of the plant area shall be reasonably arranged. At the same time, measures such as sound insulation, shock absorption, sound absorption and greening shall be taken to ensure that the noise at the plant boundary reaches the standard. |
Publicity time:2019Year10Month25Day10Month28Day
The public can consult relevant information from the construction unit and the EIA agency, and put forward relevant opinions and suggestions. Hearing notice: According to the "the People's Republic of China Administrative Licensing Law", the applicant and interested parties may request a hearing on the decision to approve the environmental impact assessment document of the construction project to be made above within five days from the publicity.
CONSTRUCTION UNIT CONTACT: Shi Gong Contact Phone:15151569808
Contact person of EIA agency: Nie Gong Contact Phone:18906245090
Environmental Protection Bureau Tel:0512-58693965 Fax:0512-58919786